Project Description

Client Corus
Location Stockton – Hartlepool
Date 2005 – 2006

 

In 2005-2006 Ovalway were a major contractor appointed by Corus to transfer the 84” pipe mill from Stockton to Hartlepool. The relocation would reinforce Corus’ site at Hartlepool as a world-leading pipe making centre of excellence.

Along with the relocation Ovalway were involved with the upgrade and redesign of the majority of the process and handling equipment.

Thousands of meters of pipework were fabricated and installed to supply the fluid power for the entire site. All pipework was site run by our team of pipe fitters and welders. All pipework was flushed and tested on completion. The entire site was commissioned by our team of engineers working closely with Corus.