In 2011 Ovalway Hydraulic Engineering designed, fabricated and installed the hydraulic piping and fluid power behind the Tees barrage. Working with the main contractor, we provided the system to operate the main gates, bear gate and slalom gate hydraulics.

This system was designed, installed, flushed and tested along with commissioning on site by our team of hydraulic technicians and engineers.

The installation was in stainless steel using the Walform tubing system as specified by the Water Authority.

The hydraulic power unit was overhauled and upgraded to ensure it would meet the demands of the new system.